Air Quality and Noise Monitoring in Gżira

Projects Air Quality and Noise Monitoring in Gżira Project Start Date: 30/06/2025 Project End Date: ongoing We are currently supporting the Gżira Local Council through an air quality and noise monitoring project along Triq Tas-Sliema — one of the busiest roads in the locality. As part of this initiative, three Kunak AirPro monitoring stations have […]
Operational Monitoring for Shoreline Residences Construction

Projects Operational Monitoring for Shoreline Residences Construction En-Sure has been awarded an operational monitoring contract for the construction of the Shoreline Residences, at SmartCity in Kalkara. The proposal, permitted by planning permit PA/01029/18, includes excavation of the site to sea level, and construction of mixed use development consisting of an underground car park, a commercial […]
Monitoring for University Residence Construction

Projects Monitoring for University Residence Construction En-Sure has been awarded an operational monitoring contract for the construction of a University Residence and Community Complex. The proposal, permitted by planning permits PA/07926/16 and PA 00456/17, includes the demolition of existing buildings, dismantling and reconstruction of a vernacular building, excavation works, as well as construction of a […]
Extension and refurbishment of the St John’s Co-Cathedral Museum

Projects Extension and refurbishment of the St John’s Co-Cathedral Museum This project requires En-Sure Ltd to monitor excavation works for the creation of a new tapestry hall on top of the ex-World War II buildings adjacent to Merchant Street. This new extension will house the renowned Flemish Tapestries and other Maltese treasures. St John’s Co […]
Environmental Monitoring for Grand Hotel Verdala Redevelopment

Projects Environmental Monitoring for Grand Hotel Verdala Redevelopment En-Sure has been awarded an operational monitoring contract for the demolition, excavation and re-construction of the Grand Hotel Verdala, Rabat. The proposal is permitted by planning permits PA/06044/17 & PA/06714/20. The development is spread over six floors above highest street level and two levels below. The proposed […]
Construction Site monitoring – City Centre

Projects Construction Site monitoring – City Centre En-Sure Ltd was proud to be at the forefront of environmental stewardship for the ambitious City Centre Multi-Use Development project in St George’s Bay. Commissioned by dB Projects Ltd, we delivered comprehensive environmental monitoring services, ensuring the project’s adherence to the highest environmental standards. Our responsibilities included: environmental […]
Water quality testing

Projects Water quality testing En-Sure was commissioned to conduct chemical testing of groundwater samples for the Energy and Water Agency (EWA) of Malta. As requested by the Authority, En-Sure sent the samples to an accredited and reliable laboratory for testing various inorganic and bacteriological parameters, including E. coli and thermotolerant coliform bacteria. En-Sure consolidated the […]
Water Discharge Monitoring for Hotels

Projects Water Discharge Monitoring for Hotels Normal operations in the hospitality, leisure, and tourism industries can generate significant environmental impacts if not properly monitored and controlled. Therefore, these activities must comply with strict environmental requirements as outlined in the Environment Protection Act (CAP. 549) and the environmental permits issued by ERA. In line with […]
Waste packaging audit

Projects Waste packaging audit Any producer or distributor of packaging in Malta must adhere to S.L. 549.43 – Waste Management (Packaging and Packaging Waste) Regulations. These regulations are designed to mitigate the negative effects of waste and its management, while also promoting waste reduction. In compliance with these regulations and at the request of the […]
IPPC permit application for pharmaceutical company

Projects IPPC permit application for pharmaceutical company En-sure have assisted a pharmaceutical company to prepare an IPPC variation of their permit for the following variations: Nitrogen Outlet: New emission point for the micronisation plant. Ventilation for Fire Safety Cabinets: Dedicated ventilation for four fire safety cabinets storing raw materials, including relocation of some materials. […]